Parallel offset
Job examples
- Jog around a beam (BCIT C4)8" round, 8" throat, two 45s, offset 24 7/16, overall 48 7/8.Filler #1 24 9/16, Filler #2 14 7/16.
- Drop under a sprinkler main14 × 10 (14 in the bend), square throat, two 22.5s, drop 12".Filler #1 28 5/8, needs at least 31 3/4 of run.
- Rolling offset6" round, 6" throat, 45s, up 18" and over 12".True offset 21 5/8, roll the elbows 33.7°, Filler #1 23 1/8.
How it's calculated
Centreline radius (CL) = throat radius + ½ the duct size in the bend. Seam height (SH) = CL × tan(elbow angle ÷ 2), rounded to the nearest 1/16". Travel = offset ÷ sin(angle), run = offset ÷ tan(angle). Filler #1 = travel − 2 SH. Filler #2 = overall length − run − 2 SH, with the overall length measured from the start of the first elbow. Rolling offset: true offset = √(offset² + roll²).